A grade 2 listed building required quality craftsmanship and skilled joinery to be supplied on time and to budget

The Aldwych Theatre
Contractor AJN Refurbishment Ltd
Year 2018
Programme 8 weeks
Scope Bespoke joinery

This West End theatre is a listed grade 2 building so to have worked on this is amazing, we manufactured and supplied the following bespoke items along with others:

  • 3 x Bars and Drinks serving counters
  • Curved bar and counters with space for fridges etc
  • Drinks shelves with wall panelling.

The building itself is magnificent so the interior had to match. Creating these huge bars and bespoke curved serving bar was great! Our joiners had a challenge in their hands but of course, with specialised machinery and the handcraft skills, it was handed over on time and with the client very happy.